Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 20, 2023

January 19, 2024

April 28, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$74,500.00

Public - City

img_map_placeholder

Multiple Locations, Ayer, MA

Subscribe to View Full Documents

Pulpit Rock Drainage and Pathway Improvements The work consists of the installation of drainage piping, a stormwater bioretention basin, landscaping, plantings, granite curbing, and a crushed stone pathway. The time for completion of this contract is 100 calendar days. The bidding and award of this Contract will be under the provisions of M.G.L. Chapter 30, Section 39M. Complete instructions for filing Bids are included in the Instructions to Bidders. Each General Bid shall be submitted in accordance with the Instructions to Bidders and shall be accompanied by a Bid Security in the amount of 5 percent of the Bid. This advertisement does not obligate the Owner for any costs associated with preparing or submitting bids. The successful General Bidder must furnish a 100 percent Performance Bond and a 100 percent Payment Bond with a surety company acceptable to the Owner. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest. Minimum wage rates as determined by the Commissioner of Department of Workforce Development under the provisions of M.G.L., Chapter 149, Section 26 to 27D, as amended, apply to this project. It is the responsibility of the contractor, before bid opening, to request, if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract Question Deadline 12/13/2023 Submit written request for clarification and interpretation to the Town of Ayer Town Engineer by email at mhernon@ayer.ma.us.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.