Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

February 12, 2024

January 30, 2025

Multiple Locations

Site Work

No Information to Display

$600,000.00

Public - City

img_map_placeholder

Multiple Locations, Big Stone Gap, VA

Subscribe to View Full Documents

Division I - Includes the base bid construction of approximately 5,774 Linear Feet (L.F.) of 10-inch waterline, 10,523 L.F. of 8-inch waterline, 8,532 L.F. of 6-inch waterline, 5,943 L.F. of 4-inch waterline, 1,421 L.F. of 2-inch waterline, 9,210 L.F. of 3/4-inch waterline, 92 gate valves, 11 blow-off valves, 21 fire hydrants, 242 water meter assemblies and reconnections, 9 6-inch master meters, 2 6-inch pressure reducing valves and associated appurtenances. Division II - Includes the base bid construction of a packaged pump station and associated appurtenances. Bid security must be at least 5% of the Bidder's maximum Bid price. the Bidding Documents and any performance and payment bonds required by the Bidding Documents.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects