Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

March 11, 2024

September 7, 2024

101 Calhoun Dr

Demolition, Site Work

No Information to Display

$3,500,000.00

Public - State/Provincial

img_map_placeholder

101 Calhoun Dr, Clemson, SC

53

14

17

Subscribe to View Full Documents

Cost Range: $3.0M - $3.5M This project includes the installation of direct bury underground steam and condensate piping and vault piping, direct buried chilled water piping and a domestic water main, and all related site demolition, restoration, erosion and sediment control, and pedestrian control. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions & correspondence concerning this Invitation shall be addressed to the A/E. A/E NAME: RMF Engineering, Inc. P.C. A/E CONTACT: Vance Nall, PE EMAIL: vance.nall@rmf.com TELEPHONE: 678-810-002

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.