Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 21, 2023

April 5, 2024

October 16, 2024

Multiple Locations

Site Work

No Information to Display

$1,804,113.00

Public - City

img_map_placeholder

Multiple Locations, Falmouth, MA

Subscribe to View Full Documents

Project was awarded to Dig It Construction for the amount of $$1,804,113.45. Estimated Cost $2,000,000 Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work consists of providing approximately 4,800 linear feet of 8-inch diameter ductile iron water main and associated valves, fittings, hydrants, services, appurtenances, and surface restoration in Point Road, Wild Harbor Road from Point Road to Loren Road, Little Island Road from Quaker Road to the end, and along Edgewater Drive West from East Falmouth Highway (Route 28) to an existing 6-inch ductile iron capped water main. The work within Route 28 is subject to the requirements of a MassDOT Highway Access Permit. Drainage work to provide deep sump catch basins, leaching basins, and associated HDPE piping shall be included in the Contract if the Owner proceeds with additive alternates based on availability of funds. Each bid must be accompanied by a Certificate of Prequalification issued by MassDOT in the "Sewer and Water" class of work. Each bid shall be accompanied by a bid security in the amount of 5% of the total bid amount. A Performance Bond and Labor and Materials Payment Bond each in the amount of 100% of the contract price will be required. Minimum Wage rates as determined by the Commissioner of Department of Labor and Industries under the provision of the Massachusetts General Labor Laws, Chapter 149, Section 26 to 27H as amended, apply to this project. All questions and requests for information about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer, Tata & Howard, Inc., attention Mitchell Garon at mgaron@tataandhoward.com. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by written addenda delivered to all parties recorded by Engineer as having received the Bidding Documents

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.