Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2024

February 21, 2024

February 5, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$2,596,395.00

Public - City

img_map_placeholder

Multiple Locations, New Market, IA

Subscribe to View Full Documents

Division 1 - Water Distribution System Improvements: Trench Compaction Testing - 1 LS; Water Main, Trenched, PVC, 4" - 15 LF; Water Main, Trenched, DIP, 6" - 60 LF; Water Main, Trenchless, PVC, 4" - 865 LF; Water Main, Trenchless, PVC, 6" - 23,495 LF; Water Main, Trenchless, DIP, 6" (Nitrile Gaskets) - 360 LF; Water Service Pipe, Trenched, Polyethylene, 3/4" - 1,450 LF; Water Service Pipe, Trenched, Polyethylene, 2" - 15 LF; Water Service Pipe, Trenchless, Polyethylene, 3/4" - 5,260 LF; Water Service Corporation, 3/4" - 212 EA; Water Service Corporation, 2" - 2 EA; Water Service, Curb Stop and Box, 3/4" - 212 EA; Water Service, Curb Stop and Box, 2" - 2 EA; Water Service Meter Pit - 212 EA; Water Main Connection No. 1 - 1 LS; Water Main Connection No. 2 - 1 LS; Water Main Connection No. 3 - 1 LS; Gate Valve, 4" - 1 EA; Gate Valve, 6" - 49 EA; Fire Hydrant Assembly - 40 EA; Flushing Device, Small Diameter Hydrant - 3 EA; Fire Hydrant Assembly Removal - 31 EA; Valve Box Removal - 14 EA; Removal of Sidewalk - 42 SY; Removal of Driveway - 102 SY; Sidewalk, PCC, 4" Thick - 27 SY; Sidewalk, PCC, 6" Thick - 15 SY; Detectable Warnings - 32 SF; Driveway, Paved, PCC, 6" Thick - 102 SY; Driveway, Granular - 95 Ton; Full Depth Patches, 7" Thick PCC - 225 SY; Full Depth Patches, 8" Thick PCC - 75 SY; Subbase Over-excavation - 95 Ton; Temporary Traffic Control - 1 LS; Seeding, Fertilizing, and Mulching - 1 LS; Mobilization - 1 LS The work on the Division 1 under the proposed contract shall be fully completed and ready for final payment within 250 working days from the written Notice to Proceed. It is anticipated that the Notice to Proceed will be issued on or after February 21, 2024 with a late start date of April 1, 2024. Successful Bidder will be required to furnish Performance, Payment and Maintenance Bond acceptable to the City of New Market on the form provided in the specifications in amounts equal to one hundred percent (100%) of the contract price. Liquidated damages in the amount of Nine Hundred and Seventy-Five Dollars ($975.00) per working day will be assessed for each day that the work shall remain uncompleted after the end of the contract period with due allowance for extension of contract period due to conditions beyond the control of the Contractor. Est. Value Notes: $2,596,395

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects