Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

February 8, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Cary, NC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Paramount Pump Station Improvements - Cary. Construction of the new 1.0 MGD submersible wastewater lift station and influent piping, connection to the existing 6-inch ductile iron force main, and demolition of the existing lift station. All electrical and instrumentation work associated with improvements. Associated earthwork, erosion control, seeding, drainage, access roadways, and other site work improvements. Any required temporary services including but not limited to bypass pumping, temporary primary and backup power supply, and temporary controls required to keep the existing pump station operational during construction, diversion of flow during startup, and the initial operation/commissioning period shall be provided by the Contractor at no additional expense to the Owner. Each proposal shall be accompanied by a Bid Bond payable to the Town of Cary for an amount of not less than five percent (5%) of the total amount bid; or in lieu of the Bid Bond, the bidder may offer the bid deposit in the form of a cashier's check, or a certified check on a bank or trust company insured by the FDIC. A Performance Bond and a Payment Bond, each in the amount of one hundred percent (100%) of the contract price, with a corporate surety approved by the Town of Cary, will be required for the faithful performance of the contract. Bidders shall provide certification that performance and payment bond sureties are licensed in North Carolina. All questions about the meaning or intent of the Contract documents shall be submitted in writing to Scott Haberstroh, P.E., Project Manager, Freese and Nichols, Inc., 1017 Main Campus Drive, Suite 1200, Raleigh, NC 27606. Email questions may be sent to scott.haberstroh@freese.com. The Town of Cary reserves the right to reject any or all proposals.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.