Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
December 6, 2023
January 5, 2024
March 15, 2024
Multiple Locations
Paving, Site Work
No Information to Display
$999,860.00
Public - County
Multiple Locations, Omaha, NE
The extent of the work consists of the construction or other effectuation of the items listed below and other related preparatory and subsidiary work from issuance of the Notice to Proceed: Item Approximate No. Bid Item Description Quantity Unit Price Total Sanitary Sewer 1 Remove 8" Pipe Plug And Cleanout 1 Ea $200.00 $200.00 2 Construct 6" Sanitary Sewer Pipe 1,040 Lf $45.00 $46,800.00 3 Construct 8" Sanitary Sewer Pipe 1,390 Lf $45.00 $62,550.00 4 Construct 6" Pipe Bedding 1,040 Lf $10.00 $10,400.00 5 Construct 8" Pipe Bedding 1,390 Lf $10.00 $13,900.00 6 Connect To Existing Sanitary Sewer Manhole 2 Ea $500.00 $1,000.00 7 Construct 54" I.d. Sanitary Manhole (5 Ea) 68 Vf $650.00 $44,200.00 8 Construct 54" I.d. Sanitary Manhole Over Existing Sanitary Pipe (1 Ea) 12 Vf $700.00 $8,400.00 9 Construct 6" Manhole Stubout 8 Ea $150.00 $1,200.00 10 Construct 8" X 6" Wye 25 Ea $90.00 $2,250.00 11 Stabilization Trench W/ Crushed Limestone 50 Tn $75.00 $3,750.00 12 Cctv Pipeline Inspection - Sanitary Sewer 1,330 Lf $4.00 $5,320.00 Contingency $10,090.00 Subtotal Sanitary Sewer $210,060.00 Storm Sewer 100 General Grading And Shaping 1 Ls $5,000.00 $5,000.00 101 Remove 24" R.c.p. 50 Lf $30.00 $1,500.00 102 Remove Type 2 Area Inlet 1 Ea $1,500.00 $1,500.00 103 Construct 18" R.c.p., Class Iii 540 Lf $55.00 $29,700.00 104 Construct 24" R.c.p., Class Iii 40 Lf $70.00 $2,800.00 105 Construct Anti Seep Collar 1 Ea $500.00 $500.00 106 Construct 54" I.d. Pond Outlet Structure With Snorkel (1 Ea) 8 Vf $1,300.00 $10,400.00 107 Install Pipe Couplers 12 Ea $50.00 $600.00 108 Construct 72" I.d. Flattop Manhole (1 Ea) 9 Vf $900.00 $8,100.00 109 Construct 18" R.c. Flared End Section W/ End Support 1 Ea $2,000.00 $2,000.00 110 Construct 24" R.c. Flared End Section W/ End Support 1 Ea $3,000.00 $3,000.00 111 Construct Manhole Ring Collar 1 Ea $600.00 $600.00 112 Construct 18" Pipe Bedding 540 Lf $15.00 $8,100.00 113 Construct 24" Pipe Bedding 40 Lf $20.00 $800.00 114 Construct Rock Rip-rap - Type "B" 15 Tn $75.00 $1,125.00 115 Stabilize Trench W/ Crushed Limestone 50 Tn $75.00 $3,750.00 116 Perform Cctv Pipeline Inspection - Storm Sewer Pipe 580 Lf $1.00 $580.00 117 Seeding - Type "A" 2 Ac $1,000.00 $2,000.00 118 Rolled Erosion Control, Type Ii 1,000 Sy $3.00 $3,000.00 119 Seeding - Type "Temporary Seed Mix" 1 Ac $500.00 $500.00 120 Straw Mulch 1 Ac $600.00 $600.00 121 Construct Silt Fence 500 Lf $3.00 $1,500.00 122 Cleanout Silt Fence 250 Lf $1.00 $250.00 123 Remove Silt Fence 500 Lf $1.00 $500.00 124 Clean Out Silt Basin 500 Cy $12.00 $6,000.00 Contingency $4,695.00 Subtotal Storm Sewer $99,100.00 Paving 200 Remove End Of Street Barricade 3 Ea $200.00 $600.00 201 Saw-cut Pavement (Full Depth) 170 Lf $7.00 $1,190.00 202 Remove Curb And Gutter 95 Lf $30.00 $2,850.00 203 Remove Pavement 114 Sy $30.00 $3,420.00 204 7" Concrete Pavement - Type 65 4,800 Sy $60.00 $288,000.00 205 Construct 6-inch Concrete Driveway - Type L85 35 Sy $50.00 $1,750.00 206 Common Earth Excavation 1,610 Cy $4.00 $6,440.00 207 Construct Thickened Edge 170 Lf $20.00 $3,400.00 208 Adjust Manhole To Grade (8 Sanitary, 0 Storm) 8 Ea $250.00 $2,000.00 209 External Frame Seal (8 Sanitary, 1 Storm) 9 Ea $500.00 $4,500.00 210 Drill And Epoxy #5 X 1'-6" Tie Bars At 48" Centers 60 Ea $13.00 $780.00 211 Construct Curb Inlet 5 Ea $5,000.00 $25,000.00 212 Construct Modified Type "A" Double Inlet 1 Ea $5,000.00 $5,000.00 213 Jet Existing Sanitary Sewer 1,330 Lf $1.00 $1,330.00 214 Remove Temporary Turnaround 165 Sy $15.00 $2,475.00 Contingency $17,465.00 Subtotal Paving $366,200.00 Sidewalks 300 General Grading And Shaping 1 Ls $2,000.00 $2,000.00 301 Common Earth Excavation - Sidewalk 100 Cy $10.00 $1,000.00 302 Remove And Replace Unsuitable Material 25 Cy $10.00 $250.00 303 Construct 5" Concrete Sidewalk 3,840 Sf $6.50 $24,960.00 304 Construct 7" Pcc Curb Ramp 240 Sf $10.00 $2,400.00 305 Construct Detectable Warning Panel 50 Sf $12.00 $600.00 306 Adjust Valve To Grade 5 Ea $150.00 $750.00 Contingency $1,600.00 Subtotal Sidewalks $33,560.00 Total Estimated Construction Cost $708,920.00 Estimated Engineering, Legal, Publication And Miscellaneous Costs $290,940.00 Total Estimated Project Cost $999,860.00 Upon approval, the Owner will issue payment to the Contractor in the amount of 90% of the contracted value of the completed work as of the end of the preceding month, as recommended by the Engineer. Payment for the balance retained will be issued by the Owner upon completion of the work and approval thereof by the Owner's Engineer, City or Governmental approval when necessary, and acceptance by the Owner. Each bid shall be accompanied, in a separate sealed envelope, by a certified or bank check drawn on a bank whose deposits are insured by the F.D.I.C. or an acceptable bid bond in the amount of $35,000.00 and shall be payable without condition to SANITARY AND IMPROVEMENT DISTRICT NO. 578 OF DOUGLAS COUNTY, NEBRASKA as a guarantee that the bidder, if successful, will execute the contract and provide an acceptable Contract Bond from an approved surety in the amount of 100 percent of the contract price. No bidder may withdraw his Bid for a period of THIRTY (30) days after the date set for the opening of bids. The Owner reserves the right to reject any or all bids and to waive informalities. Project No. 0116071.33-030/040/050/057/330/340/350/357
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Omaha, NE
Bid Date: Dec 21 2023
Omaha, NE
Bid Date: Jan 23 2024
Omaha, NE
Bid Date: Oct 09 2024
Omaha, NE
Bid Date: Sep 17 2024
Omaha, NE
Bid Date: Oct 09 2024
Omaha, NE
Bid Date: Sep 19 2024
Omaha, NE
Bid Date: Jan 09 2024
Omaha, NE
Bid Date: Jan 23 2024
Omaha, NE
Bid Date: Jan 24 2024
Omaha, NE
Bid Date: Jan 10 2024
Omaha, NE
Bid Date: Jan 18 2024
Omaha, NE
Bid Date: Jan 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
