Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 22, 2023

February 20, 2024

August 18, 2024

1245 San Carlos Ave

Renovation

No Information to Display

$1,553,000.00

Public - City

img_map_placeholder

1245 San Carlos Ave, San Carlos, CA

Subscribe to View Full Documents

**As of January 8, 2024, this project has not yet been awarded. The project is expected to be awarded on January 25, 2024.** Project Description: Work of this Contract comprises the modifications to the existing unoccupied tenant space at 1245 San Carlos Avenue. Work includes constructing private offices, a kitchenette, a conference room, two single occupant restrooms (one of which is accessible), storage space, a flex space, an accessible lift, a metal framed second floor, stairs to the second floor, a private room on the second floor, new mechanical system (ducts, registers, roof equipment, zoning boxes), new electrical (off of existing panels), new plumbing, modify fire sprinkler system, new lighting, floor finishes, acoustic baffles, and paint. Coordinate and install low voltage infrastructure with owner. Work shall be completed within 180 Days from the date when Contract Time commences to run Reservation of Rights: Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Owner may reject any and all Bids and waive any minor irregularities in the Bids Portion of Work to be Performed by Contractor: The successful bidder shall self-perform no less than 10% of the Work described in the Contract Documents utilizing its own work force, excluding Specialty Items. Specialty Items will be identified in the Contract Documents.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects