Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

February 8, 2024

March 28, 2024

500 Lomas Santa Fe Dr

Renovation

No Information to Display

$75,000.00

Public - City

img_map_placeholder

500 Lomas Santa Fe Dr, Solana Beach, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000335972 The work to be done consists of furnishing all materials, equipment, tools, supervision, labor and incidentals required to complete the above stated project. The work includes: complete the above stated project. The work includes: Supply, Deliver, and Install New Ingersoll Rand Air Compressor, Model No. 2475N5, 80 Gallon Vertical, with premium package accessories, or approved equal. One (1) Install New Electronic Drain valve, One (1) F-Series Filters Three (3) Air Reel, Model Reelcraft 7650 OLP-3/8 in. X 50 ft. Premium Duty Hose Reel Approximately 120 ft. of 1/2 in. copper lines for new air reels Job Location 500 Lomas Santa Fe, Solana Beach. CA, 92075 General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Prevailing Wage Required Question Deadline 01/09/2024 at 10:00 AM PT Questions are submitted online Yes All bidders shall direct their questions during the bidding period to the Engineering Department of Solana Beach at (858) 720-2470. All work shall be completed in every detail to the satisfaction of the City Engineer within 35 working days after the date of the Notice to Proceed. Bonding Requirements - Bid Bond 100 % - Performance Bond 100 % - Labor and Materials Bond 100 % *The City reserves the right, after opening bids, to reject any or all bids; to make an award to the lowest responsible bidder and reject all other bids; to waive any irregularities or informalities in the bidding; and to make an award on the base bid or on the basis of any combination of bid schedules and alternatives or options listed in the bid which, in its opinion, serves the best interest of the City, including awarding different pieces of the work to the same or different bidders. Pre-Bid Conference: A mandatory pre-bid conference will be conducted at the Solana Beach Fire Station, 500 Lomas Santa Fe, Solana Beach, CA 92075, on Tuesday, December 19th, 2023, at 10:00 am.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects