Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 20, 2023

January 12, 2024

February 11, 2024

460 Garfield Ave

Demolition, Site Work

No Information to Display

$210,000.00

Public - City

img_map_placeholder

460 Garfield Ave, Aurora, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Demolition, removal, and proper disposal of materials all in accordance with the details and specifications. All inquiries and/or questions pertaining to the provisions of this Request for Proposal package shall be directed in writing to, the Director of Purchasing at PurchasingDL@aurora.il.us , by 12:00 pm CST, Friday, December 1, 2023. An addendum will be posted to the City's website by 12:00 pm, Wednesday, December 6, 2023. Questions may not be communicated by telephone and questions received after this date/time will not receive a response. Description of Work 460-480 Garfield Av. Aurora IL 60506 Proposed Improvement: Demolition of the structure, all on parcel pavement at 460-480 Garfield Av. Aurora IL 60506 and restoration of site to seeded grass. 5% of the total bid price, or for the amount specified in the proposal documents. Performance Bond acceptable to the Engineer in the amount of one hundred percent (100% of the full contract price, a Payment Bond, Public Liability Insurance, and Workers Compensation Insurance; all of which shall be acceptable to the City of Aurora. This Phase I ESA was conducted utilizing a standard of good commercial and customary practice that was consistent with the ASTM Standard Practice E 1527-13 and E 1527-21. Significant scopeof-work additions, deletions, or deviations to ASTM Practice E 1527-13 and E 1527-21 are noted below, or in the corresponding sections of this report. The scope-of-work for this assessment included an evaluation of the following: o Physical characteristics of the Subject Property through a review of referenced sources for topographic, geologic, soils, and hydrologic data. o History of the Subject Property through a review of referenced sources such as fire insurance maps, directories, aerial photographs, and interviews. o Current site conditions including observations and interviews regarding the presence or absence of hazardous substances or petroleum products; generation, treatment, storage, or disposal of hazardous, regulated, or medical waste; equipment that utilizes oils which potentially contain PCBs; and storage tanks (aboveground and underground). o Usage of surrounding area properties and the likelihood for releases of hazardous substances and petroleum products (if known and/or suspected) to migrate onto the Subject Property. o Information in referenced environmental agency databases and local environmental records, within specified minimum search distances

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.