Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 30, 2024

May 27, 2024

January 27, 2025

132 Eastern Pkwy

Renovation

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

132 Eastern Pkwy, Louisville, KY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Per Addendum 2- Bid Date was Extended JB Speed School Renovation. Question Deadline 12/08/2023 at 2:00 PM ET. SCOPE OF WORK Asbestos Abatement The University has had an initial Asbestos Survey completed. The GC shall retain a certified Asbestos Abatement contractor for the necessary asbestos abatement scope Maintaining accessible campus use of the elevator will be required Install Main Conduits and Main Piping Risers - All Floors Complete Mechanical and Chilled Water Taps Ground Floor Install Heat Recovery Chiller Ground Floor Complete Mechanical Rooms and Mechanical Room 120 First Floor Complete new Mechanical Room 201A and 218Acond Floor Complete all HVAC and Electrical - Third Floor Exterior Work Install Medium Voltage Switchgear and Transformer, Install Underground Conduits to Buildings Restroom renovation Complete HVAC Demo Steam/Condensate Piping. Electrical Distribution and Medium Voltage Shutdown and Re-feed Ground Floor Complete Ductwork, Electrical, and Mechanical Room 110A First Floor Complete Ductwork and Electrical Second Floor The contractor shall protect in place all built-in casework, sensitive equipment that cannot be removed from the building, and furniture. Should the contractor remove furniture from a room, the contractor is responsible for moving the furniture into the original location upon completion of the phase/project. The University will be responsible for removing personal belongings and IT/AV equipment before construction commencement. o Reference Exhibit P, Furniture and Equipment Protection Guidelines Walls where equipment is removed, the wall is to be patched to match the existing surface. The wall shall be painted corner to corner to match the color of the room. The Owner's decision shall be final. Bidders must enclose descriptive literature with their bids so that the equality can be verified. Failure to enclose sufficient literature may result in the rejection of the bid. Bids shall be accompanied by a bid guarantee of not less than five percent (5%) of the amount of the base bid executed by a Surety Company authorized to do business in the State of Kentucky and countersigned by a licensed Kentucky Resident Agent representing the Surety Company. The awarded Contractor shall furnish a performance and payment bond in an amount equal to one hundred percent (100%) of the contract price as security for the faithful performance of this contract and for the payment of all persons performing labor, including payment of all unemployed contributions which become due and payable under the Kentucky Unemployment Insurance Law furnishings materials in connection with this contract. Certified Check Acceptable. For violation of this provision, the University shall reserve the right to reject the bid

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects