Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 16, 2024

February 15, 2024

May 25, 2024

Multiple Locations

Site Work

No Information to Display

$700,000.00

Public - City

img_map_placeholder

Multiple Locations, Shabbona, IL

18

7

2

10

Subscribe to View Full Documents

Construct 713 L.F. of an 8" water main loop along US Rte. 30. Construct 8" water main replacements (two locations totaling 2440 feet) along Shabbona Rd including reconnection of the existing water services. This project is partially funded by the Il Environmental Protection Agency (IEPA). IEPA rules require that all potential contractors with subcontracting opportunities advertise for DBE subcontractors at least 16 days prior to bid opening. Advertisements for DBEs must be published in a daily newspaper for a minimum of 1 day. Please contact Chastain & Associates at 815-489-0050 with any questions.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects