Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

November 7, 2024

May 1, 2025

56595 180th St

Addition, Demolition, Site Work

No Information to Display

$50,000.00

Public - County

img_map_placeholder

56595 180th St, Ames, IA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Story County Conservation McFarland Shop 56595 180th St Ames, IA 50010 Removal and replacement of a maintenance shop building. The proposed improvements will require earthwork operations, utility distribution, footings and foundation, slab on grade, construction of new building to accommodate office space, storage, bay for equipment and vehicle repair, chemical storage, breakroom and restrooms. Time for Commencement and Completion of Work. Work on the improvements shall commence upon approval of the contract by the Conservation Board and as stated in the Notice to Proceed. All work under the Contract must be substantially complete on or before April 15, 2025 and final completion on May 1, 2025. Liquidated damages as set forth in the Contract, in the amount of $200 per day. Maintenance and Warranty bond shall be held in effect to guarantee the maintenance of the improvement caused by failures in materials and construction for a period of 1-year from and after final acceptance of the work

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.