Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 5, 2023

January 12, 2024

June 6, 2024

Center Rd & Rhododendron Dr

Site Work

No Information to Display

$22,000.00

Public - City

img_map_placeholder

Center Rd & Rhododendron Dr, Florence, OR

Subscribe to View Full Documents

The project generally consists of the following work: replacing approximately 200 LF of 8-inch AC waterline with approximately 200 LF of 8-inch C900 waterline, modifications to one utility vault appurtenances, abandonment of one utility vault, repair of pavement surface. Work is to be performed at the intersection of Center Road and Rhododendron Drive. Pre-Qualification: Yes Est. Completion Date: May 31, 2024 Site Directions: Work is located in the intersection of Rhododendron Drive and Center Road. Technical questions regarding the project should be directed to: Tyler Duncan, PE at 425/471-8625, tduncan@rh2.com.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.