Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 9, 2024

June 3, 2024

September 11, 2024

Multiple Locations

Renovation

No Information to Display

$2,666,705.00

Public - County

img_map_placeholder

Multiple Locations, Cheyenne, WY

14

18

8

4

Subscribe to View Full Documents

Site Directions: Baggs Elementary School 3705 Cheyenne Street Cheyenne Wy 82001 Rossman Elementary School 916 West College Drive Cheyenne Wy 82001 Sunrise Elementary School 5021 East 13th Street Cheyenne Wy 82001 Baggs Elementary School Remove All Existing Layers of the Pvc Roof System, Insulation, Flashings, and Metal Flashings. Install New Fully Adhered Black Epdm Roof System With New Insulation, Tapered Insulation Crickets, Saddles and Coverboard. Remove All Hvac Units From Curbs, Flash Curbs Up and Over the Top, Raise Curbs as Needed and Reinstall Hvac Units. When Raising Curbs Extend All Electrical, Control Wiring, Plumbing, and Duct Work as Needed. See Plans for Complete Scope of Work. Rossman Elementary School Remove All Existing Layers of the Pvc Roof System, Insulation, Flashings, and Metal Flashings. Install New Fully Adhered Black Epdm Roof System With New Insulation, Tapered Insulation Crickets, Saddles and Coverboard. Remove All Hvac Units From Curbs, Flash Curbs Up and Over the Top, Raise Curbs as Needed and Reinstall Hvac Units. When Raising Curbs Extend All Electrical, Control Wiring, Plumbing, and Duct Work as Needed. See Plans for Complete Scope of Work. Sunrise Elementary School Remove All Existing Layers of the Pvc Roof System, Insulation, Flashings, and Metal Flashings. Install New Fully Adhered Black Epdm Roof System With New Insulation, Tapered Insulation Crickets, Saddles and Coverboard. Remove All Hvac Units From Curbs, Flash Curbs Up and Over the Top, Raise Curbs as Needed and Reinstall Hvac Units. When Raising Curbs Extend All Electrical, Control Wiring, Plumbing, and Duct Work as Needed. See Plans for Complete Scope of Work. Bid Result Package 1 FRONT RANGE ROOFING SYSTEMS-$905,000 Package 2 BIG HORN ROOFING-$817,445 Package 3 SUPERIOR ROOFING-$944,260

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.