Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 12, 2023

July 22, 2024

No Information to Display

1500 GA-197

Renovation

No Information to Display

$2,600,000.00

Public - State/Provincial

img_map_placeholder

1500 GA-197, Clarkesville, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Purcell Building, built in 1969, rests on the border of North Georgia Technical College s beautiful main quad in the center of campus among prime real estate for student instruction, learning and gathering. Known for previously housing Machine Tool/CNC for decades, Purcell currently houses the Electrical Systems Technology program and is now needed for program expansion and a future Plumbing and Construction Maintenance and Management program. To accommodate the new program, NGTC intends to renovate Purcell Hall. A redesigned 16,941 sq. ft. floor plan will give additional floor space for labs as well as classrooms, office space, storage space, and ADA compliant restrooms. The exterior will be modified to blend with the current campus facilities and present an aesthetic entrance at both the interior quad entrance and the popular back parking lot entrance adjacent to the main road encircling the campus. Currently, Electrical Systems is at full capacity in an inadequate classroom and lab location, and the program has had an enrollment growth of 48% from 27 students in fall 2016 to 41 students in fall 2021. The proposed Plumbing and Construction Maintenance and Management program is predicted to begin with an enrollment of 25 to 40 students during the first year. Both of these programs are current high demand career fields in the college s eight county service area. The Project construction cost is estimated to be in the range of $2,600,000. The design professional is finalizing construction documents for the Project, which should be complete and available for distribution to eligible firms in January 2024. It is anticipated that construction will begin by April of 2024. The duration to reach material completion of the project is estimated as 305 days from the date specified in the proceed order. The Owner reserves the right to reject any and all Statements of Qualifications, or to postpone or cancel this Project or this solicitation. Question Deadline 11/29/2023 at 2:00 PM ET Deadline for submission of written questions and requests for clarification Questions about any aspect of the RFQ/ITB, or the Project, shall be submitted in writing via e-mail is to: e-mail: jeff.lacks@gsfic.ga.gov The delivery method for this Project will be design-bid-build. The Owner has employed the services of a Design Professional and a Commissioning Agent. Questions regarding the Bidding Documents should be directed to the Design Professional listed below. No questions other than those submitted in writing will be accepted, and only written responses will be binding upon GSFIC.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.