Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 6, 2023

January 10, 2024

No Information to Display

31300 Metro Pkwy

Site Work

No Information to Display

$64,341.00

Public - State/Provincial

img_map_placeholder

31300 Metro Pkwy, Harrison Township, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Reference Number 0000335479 HCMA is soliciting for the replacement of an existing 250 KVA Transformer with a new 250 KVA Transformer. This project encompasses the removal and proper disposal of the existing transformer, installation of a new transformer, testing, and cabling inspection. The job site is located at the South Marina within the Lake St. Clair Metropark (31300 Metro Parkway, Harrison Township, MI 48045 - see site map in the bid documents). Delivery Point 31300 Metro Parkway, Harrison Township, MI 48045 Question Acceptance Deadline 11/29/2023 01:00 PM EST Questions are submitted online No Direct any/all inquiries to Travis Grubb in writing via e-mail only Purchasing Contact: Travis Grubb, Senior Buyer travis.grubb@metroparks.com (810) 494-6049 Purchase Type One Time Only- Delivery Date:ASAP Preparatory Work o Verify and document transformer specifications prior to disconnecting. o Isolate and lockout primary power at the utility, disconnect, and isolate the transformer. o Perform removal and proper disposal of the leaking/failing transformer. o Inspect, test, and reutilize existing ground mat and grounding electrode conductor for integrity. Transformer Replacement o Provide and install one 250 KVA Pad mount Transformer o Previously installed load break elbows or stress cones are not applicable to the new transformer format. Testing and Certification o Arrange for third-party testing and certification of the new transformer prior to installation. o Energize, test, and label the new transformer, including testing of facility power Labor and Services o Provide all equipment, labor, materials, permits, and other services required for a successful installation. o Coordinate with any subcontractors necessary for the successful completion of the project. o Ensure that qualified, licensed contracting services and labor are provided. Shutdown Execution o All prep-work must be performed prior to the shutdown execution to ensure minimal disruption o If a DTE shutdown is required, coordinate with DTE and HCMA to ensure minimal disruption and adherence to safety protocols.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects