Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 23, 2024

March 25, 2024

March 25, 2026

Multiple Locations

Site Work

No Information to Display

$8,764,000.00

Public - County

img_map_placeholder

Multiple Locations, Lawndale, NC

51

25

5

Subscribe to View Full Documents

Payment can be made by either: 1.Credit Card 2.Check made payable to Duncan-Parnell - mail check to: 11333 a Granite St, Charlotte, NC 28273 ATTENTION: MARK DEVLIN. To expedite your order you can email copy of your check to arrowood@duncan-parnell.com Printing will not begin until a copy of the check OR the check is received 3.Duncan-Parnell Account Purchase of entire bid set includes all plans and specifications, including any addenda released at time of order. Planholders will be notified by email when future addenda are issued and it will be the responsibility of each plan holder to download the addenda. Shipping, if required, will be charged to each order. Online orders are fulfilled within 1-2 business days. Public Notes: For information regarding this project please contact: Laura Wallace, PE Willis Engineers Phone: 704-338-4673 Email: laura@willisengineers.com For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron The Project includes the following Work: The Project consists of construction of one new low-head weir, including a moveable crest gate and boulder cascades. The Project will also include stabilization of the stream banks.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.