Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 14, 2023

January 15, 2024

March 15, 2024

U.S. HWY 82

Site Work

No Information to Display

$300,000.00

Public - County

img_map_placeholder

U.S. HWY 82, Leesburg, GA

7

11

4

Subscribe to View Full Documents

The construction of 130 LF jack & bore 12" steel casing with 0.250" wall thickness and 8" ductile iron carrier pope, 20 LF 8" ductile iron water main, one (1) fire hydrant and appurtenances and all other appurtenances necessary for a complete job. All work on the Project must be completed within _60_ consecutive calendar days of date of notice to proceed. No bid will be considered unless sealed and filed with Lee County Utilities Authority prior to the time set forth above, and accompanied by a Bidder's Bond, payable to the Lee County Utilities Authority, for 10 percent of the amount of the bid; to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required Payment Bond and Performance Bond and Insurance Certificates. Bids arriving after the designated time will be returned unopened. No bids shall be withdrawn for a period of 60 days after the opening of bids. Lee County Utilities Authority reserves the right to reject any or all bids and to overlook and/or disregard informalities or irregularities in the proposals. Question Deadline 12/07/2023 To receive consideration, such questions shall be submitted in writing to the Engineer

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects