Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

April 18, 2024

August 10, 2027

4314 Crutchfield St

New Construction, Paving, Site Work

No Information to Display

$3,345,000.00

Public - City

img_map_placeholder

4314 Crutchfield St, Richmond, VA

669

41

57

3

Subscribe to View Full Documents

Scope of Work: This work is generally comprised of the construction of a new two- story high school building, totaling approximately 281,969 square feet including: site development, mechanical, electrical, plumbing, fire protection, interior build-out, and finishes. The new high school building consists of two, two-story classroom wings, a two-story Auditorium, a one-story Gymnasium and a one-story core area. The new school building has no basement. The new school building will be located on the existing baseball and football fields east of the existing school building. New parking lots and driveways will be constructed around the new school building. Please direct any and all questions regarding the Invitation for Bid and/or Invitation for Bid Documents in writing to Mary Beth Reed, Construction Procurement Manager, at mreed3@rvaschools.net. Questions must be received no later than December 7, 2023. Electronic Documents: Project documents (Invitation for Bids, Project Manuals, Drawings, and any other applicable documents) provided electronically are solely for use by the Bidder for the convenience of preparing a bid response for the project. Electronic documents shall not be altered, and shall not be reproduced for any purpose other than the express purpose stated above. Any conclusion or information obtained or derived from such electronic files will be at the Bidder's risk. If there is a discrepancy between the electronic files and the hard copies on file with the County, the hard copies govern. If CAD files are available, RPS does not release, nor authorize its engineering and design consultants to release them prior to execution of the Notice to Proceed.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.