Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 17, 2024

February 16, 2024

November 17, 2025

River Legacy Dr

Paving, Site Work

No Information to Display

$5,219,376.00

Public - City

img_map_placeholder

River Legacy Dr, Arlington, TX

Subscribe to View Full Documents

Budget: $5,219,375.90 Scope of Work includes realignment and replacement of approximately 2.3 miles of existing trail within the Trinity River Floodplain. Project limits between pedestrian bridge crossing located at the west end of the park, adjacent to Greenbelt Road and the pedestrian bridge crossing located at the east end at N. Collins St. parking lot. Besides replacing, realigning, and widening of the trail, the project includes replacing the pedestrian bridge and aerial sanitary sewer crossing located at Snider Creek bridge with a new pedestrian bridge designed to sustain vehicular loads. The project also includes installation of a new pedestrian bridge crossing at another location. The scope of work includes replacing approximately 2,857 linear feet of 6-inch to 12-inch sanitary sewer mains located within the River Legacy Park. The project scope includes landscape improvements, site improvements and construction of all supporting appurtenances. The project has been assigned MWBE GOAL of 26.30% Question Cuttoff Date & Time 12/21/2023 02:00:00 PM (ET)

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.