Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

January 6, 2025

April 30, 2031

1704 91 St SW

LEED Certification, New Construction, Site Work

No Information to Display

$432,000,000.00

Public - City

img_map_placeholder

1704 91 St SW, Edmonton, AB

20

17

26

Subscribe to View Full Documents

The Southeast Transit Garage is planned to be an up to 430 forty-foot equivalent emissions neutral facility able to store and maintain a fully zero emission fleet. The garage is planned to include a mix of zero emission technology, including both Fuel Cell Electric Buses (FCEB) and Battery Electric Buses (BEB). The final determination of Zero Emission Bus (ZEB) technology will be informed by results from the Citys current BEB deployment and FCEB pilot project and will be confirmed during the preconstruction stage of the project. The project delivery method will be Construction Management at Risk (CMAR) which is recognised for collaboration between all members of the Project team during the pre-construction, construction, and post construction stages. This collaboration includes activities such as design reviews, constructability and value analysis/engineering, development of the tender process as well as other key objectives as identified in the Contract. Documents can be obtained from https://discovery.ariba.com/rfx/20494205

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.