Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 10, 2024

April 1, 2024

No Information to Display

4748 Arrow Hwy

New Construction, Site Work

No Information to Display

$11,000,000.00

Public - County

img_map_placeholder

4748 Arrow Hwy, Montclair, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe to View Full Documents

West Valley Maintenance Facility. This project is funded under a financial assistance contract by the U.S. Department of Transportation and is subject to all conditions of the Davis-Bacon Act (40 U.S.C. 276a) and the Labor Code of the State of California commencing in Section 1770 et. seq. It is subject to monitoring and enforcement by the Department of Industrial Relations (DIR). Contractor is obligated to submit certified payroll records directly to the DIR's electronic certified payroll system. A California State Contractor's License is required of the prime bidder. Bidders must possess the proper licenses for all the types of work identified in the scope of work for electrical, concrete, painting, etc. at the time of Contract award. The Q&A module is available through Omnitrans online bidding system is to be used for all request for approved equal, clarification, changes, exceptions, or deviations whether to the Scope of Work or Purchase Order terms and conditions. Question Deadline 11/30/2023 at 3:00 PM PT All questions or clarifications must be submitted through Omnitrans' online bidding system, Omnitrans will respond to all questions through the online bidding system by issuing a written addendum. LIQUIDATED DAMAGES In the event Bidder, after entering into a Contract with Omnitrans, fails to complete the work within the time specified in the Contract, the Bidder will be required to pay Omnitrans the amount of $400 per calendar day per bus (18) of delay as agreed to liquidated damages. Bids received after the time and date due will be rejected without consideration or evaluation. Under no circumstances will any bid be accepted after the due date and time. Bid Bond 100.00% Payment Bond 100.00% Performance Bond 100.00%

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects