Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2024

March 25, 2026

No Information to Display

Clifton Ave

Site Work

No Information to Display

$1,434,593.00

Public - City

img_map_placeholder

Clifton Ave, Cincinnati, OH

Our team is requesting plans for this project.

Subscribe to View Full Documents

This project will rehabilitate approximately 3,240-feet of existing sewer with a cured-in-place pipe (CIPP) liner along Clifton Ave. The sewers that are going to be rehabilitated are as follows: approximately 290 linear feet of 18-inch diameter pipe, approximately 740 linear feet of 21-inch diameter pipe, and approximately 2,210 linear feet of 24-inch diameter pipe.. The work takes place in City of Cincinnati's Clifton neighborhood, Hamilton County, Ohio Questions on this project or any part of the Contract Documents and other project documents must be sent via e-mail to MSD.PROCUREMENT@cincinnati-oh.gov by the established deadline. The deadline for questions is 12:00 PM local time on Thursday, January 18, 2024. Bids must be submitted in accordance with the Contract Documents and must be accompanied by the 'Bid Guaranty and Contract Bond,' certified check, or letter of credit drawn on a solvent bank in an amount not less than ten percent (10%) of the bid amount, and in no event shall be less than five hundred dollars ($500.00). The established SBE Participation Goal for this project is: 2%. Bidder is required to complete and submit the SBE Goal Compliance Plan Cover Page with bid. If the SBE goal will not be met, the bidder shall also complete and submit the Waiver Request Form and Affidavit, and the SBE Subcontractors Good Faith Efforts (GFE) Summary Sheets with the bid. To be eligible for award of a contract or procurement when the SBE goals will not be met, the bidder must complete all SBE Subcontractors GFE Summary Sheets to support the Waiver Request Form and Affidavit areas checked. Failure to complete and submit required documentation may cause a bid to be rejected as non-responsive.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects