Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 18, 2024

March 18, 2024

September 20, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$9,500,000.00

Public - County

img_map_placeholder

Multiple Locations, Sacramento, CA

44

21

58

3

Subscribe to View Full Documents

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. Question Submission Deadline: 5 Dec 2023, 2:00pm Direct pre-bid questions to the Project Manager, Daniel Lockett, via the Q&A tab in the portal. ESTIMATED CONSTRUCTION COST: $9,500,000 CONTRACTOR LICENSE REQUIRED: General Engineering Contractor, Class A The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: doing all the work necessary associated with placing a rubberized or conventional concrete pavement overlay or slurry seal, repairing failed pavement (base repair), grinding the pavement to accommodate the overlay (cold planning), adjusting the manholes to grade, installing sidewalk accessibility ramps, placing pavement striping, markings, and markers, as well as other items and details. The time of completion of this contract shall be 130 working days. Locations- HOWE AVE (500' S/O AUBURN BLVD TO I-80) WATT AVE (EL CAMINO AVE INTERSECTION RAMP WORK ONLY) WATT AVE (FAIR OAKS BLVD TO HURLEY WY - SAN YSIDRO WY) VINTAGE PARK DRIVE (CALVINE RD TO BRITTANY PARK DR)

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects