Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 28, 2024

No Information to Display

N Kiowa-Bennett Rd

Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

N Kiowa-Bennett Rd, Bennett, CO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

As of January 9, 2024, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to November 2024. *The closed solicitation has been included below for reference: Reference Number 0000334283 Question Acceptance Deadline 11/14/2023 at 12:00 PM MT Questions are submitted online No All technical inquiries regarding this RFP shall be made in writing to Daymon Johnson - djohnson@bennett.co.us by the date specified in the above project schedule. Non-technical inquiries may be directed to Daymon Johnson - 303.644.3249 x1005 The Town of Bennett is seeking proposals from qualified trail design consultants & firms, who have verifiable experience in trail design and development, to design approximately 3.5 miles of 8 to 10-foot wide concrete, partially motorized (maintenance only), non-equestrian-use trails, using sustainable trail development principles. The trail alignment includes significant Kiowa Creek floodplain lengths and areas, requiring permitting, design/improvement and impact mitigation considerations and requirements. The trail utilizes the existing I-70 Kiowa Creek bridge as a trail underpass under I-70, requiring further floodplain and bridge hydraulics impacts and mitigations. PROJECT DESCRIPTION: The Kiowa Bennett TIP Trail consists of 3 segments. Segment 1 is the North Segment which runs North & South along the east side of State Highway 79, terminating near the existing QuikTrip. Segment 2 is the middle or Central Segment, which runs from the Southernmost point of Segment 1, heads East and proceeds to the I-70 Corridor underpass in alignment with Kiowa Creek. Segment 3 of this trail is the South segment, which takes the trail from Kiowa-Bennett Road, through the Kiowa Creek North Open Space, connecting to the Southernmost point of Segment 2 The Town reserves the right to reject all Proposals and re-solicit if deemed by the Town to be in its best interests, and to abandon the Project and this RFP at any time for any or no reason. Buyer Preferences, Guidelines & Requirements General Requirements - Federally Funded - Insurance Required - License Required

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects