Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

February 16, 2024

No Information to Display

551 Peacedale St

Site Work

No Information to Display

$2,377,000.00

Public - City

img_map_placeholder

551 Peacedale St, Bristol, CT

Our team is requesting plans for this project.

Subscribe to View Full Documents

Prospective bidders shall examine the "Instruction to Bidders" and "Supplementary Instructions to Bidders" and shall comply and conform strictly with the conditions and instructions contained therein. In accordance with CGS Sections 4a-100 and 4b-91, firms submitting bids must be pre-qualified with the State of Connecticut Department of Administrative Services ("DAS") to perform General Construction Class B, and shall include with their bid a copy of a current certificate and Update (Bid) Statement as issued by DAS. The awarded contractor will be required to secure a Performance Bond and a Labor and Materials Bond, each in the amount of 100% of the contract award, provided by a surety licensed to do business in the State of Connecticut. The requirements for prevailing wage rates are to apply to the resultant contract award. Pursuant to Public Act 15-5, this contract is subject to state contract compliance requirements, including non-discrimination statutes and set-aside requirements. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification from the Connecticut Department of Administrative Services. The contractor must demonstrate good faith effort to meet the 25% set-aside goals. The City reserves the right to waive any informalities in the bid, to reject any or all bids, and to accept the bid that in its judgment is in its best interest. Bids must be firm and may not be withdrawn for a period of 90 days following the bid opening. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, gender, or national origin.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.