Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

December 11, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$830,000.00

Public - County

img_map_placeholder

Multiple Locations, Houston, TX

Our team is requesting plans for this project.

Subscribe to View Full Documents

Work to include but not limited to: Rehabilitate Existing Lift Station No. 6 by cleaning, power washing, abrasive blasting, and recoating of existing wet well, aboveground piping, fittings, valves, and vent; removal, disposal, and replacement of wet well piping, fittings, submersible pumps, vent screen and bolts, access hatches, and safety net. Rehabilitate Existing Lift Station No. 7 by cleaning, power washing and inspecting T-Lock Lining with Engineer; repair T-Lock Lining as directed by Engineer; cleaning and power washing valve vault; abrasive blasting and recoating valve vault piping, fittings, and valves; grout valve vault floor to slope to drain; removal, disposal, and replacement of wet well piping/ fittings and wooden fence; furnish and install safety net for wet well and pipe bollards. Rehabilitate Existing Lift Station No. 8 by cleaning, power washing and inspecting T-Lock Lining with Engineer; repair T-Lock Lining as directed by Engineer; abrasive blasting and recoating aboveground piping, fittings, and valves; removal, disposal, and replacement of wet well piping/ fittings and wooden fence; saw cut, remove, and replace asphalt for electrical equipment. Install bypass pumping for all three lift station and electrical upgrades on all lift station. All work performed shall be in accordance with the plans and specifications. Complete in place. There will be no pre-bid meeting associated with this project. A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.