Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 16, 2023
December 18, 2023
No Information to Display
902 Colerick St
Renovation
No Information to Display
$500,000.00
Public - City
902 Colerick St, Fort Wayne, IN
Project R-1: 2024 Roof Replacement and Related Work at Weisser Park Elementary School Bids received after that time or in another location shall be returned to the bidder unopened. Bids shall be received from a single prime contractor. Each bid shall be accompanied by a certified check, a cashier's check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid. In the event a bidder withdraws its bid or fails to execute a satisfactory contract within ten (10) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier's check or bid bond forfeited to Fort Wayne Community Schools, as liquidated damages. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. A bid may not be modified, withdrawn or cancelled by the bidder for sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Fort Wayne Community Schools reserves the right to assign all or any portion of any bid and/or contract to any non-profit building corporation controlled by Fort Wayne Community Schools without the consent of any other party, and any employee of Fort Wayne Community Schools may be designated by Fort Wayne Community Schools and/or any such non-profit building corporation to serve as the authorized agent or representative of such non-profit building corporation with respect to any such bid or contract. Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the drawings and specifications as prepared and on file in the office of: Martin-Riley Architects Engineers 221 West Baker Street Fort Wayne, Indiana 46802 260.422.7994; martin-riley.com Additional Bidding documents may be purchased per the options and pricing listed on the Order page (plus Processing/ECO fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases. Only Complete sets of plans and specifications will be distributed. Any unsuccessful bidder, upon returning such sets in good and usuable condition within (10)ten days of the bid date will be refunded their deposit. If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering Supply and are posted on the Spec Sheets tab.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Fort Wayne, IN
Bid Date: Sep 28 2023
Fort Wayne, IN
Bid Date: Sep 28 2023
Fort Wayne, IN
Bid Date: Sep 28 2023
Fort Wayne, IN
Bid Date: Sep 14 2023
Fort Wayne, IN
Bid Date: Oct 31 2023
Fort Wayne, IN
Bid Date: Oct 31 2023
Fort Wayne, IN
Bid Date: Oct 31 2023
Fort Wayne, IN
Bid Date: Oct 31 2023
Fort Wayne, IN
Bid Date: Nov 02 2023
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Nov 16 2023
Fort Wayne, IN
Bid Date: Oct 26 2023
Fort Wayne, IN
Bid Date: Nov 21 2023
Fort Wayne, IN
Bid Date: Oct 19 2023
Fort Wayne, IN
Bid Date: Oct 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
