Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 30, 2024

No Information to Display

2200 E University Dr

Service, Maintenance and Supply

No Information to Display

$1,600,000.00

Public - City

img_map_placeholder

2200 E University Dr, Compton, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

RFP for Construction Management and Inspection Services for The JWJ Reservoir Chemical Dosing System Project (EO-3583) The Long Beach Utilities Department (LBUD) intends to engage the services of a professional engineering consulting firm (Consultant) to provide construction management and inspection services for the JWJ Reservoir Chemical Dosing System (Project). LBUD anticipates the start of construction of the Project in second quarter of 2024. The construction cost estimate for the Project is $1.6M. The Consultant shall provide construction management services, inspection services, engineering support, coordination with LBUD staff and agencies, and represent LBUD for the duration of the Project. This project is also subject to LBUD's Project Labor Agreement for both the Contractor and the CM Team per Exhibit F. Request the pre-proposal meeting information and RSVP for the pre-proposal meeting by sending an e-mail to Myung Chun (myung.chun@lbwater.org) and include the subject line "Construction Management and Inspection Services for the JWJ Reservoir Chemical Dosing System Project: RSVP to Pre-Proposal Meeting". It is encouraged to RSVP a minimal of 48 hours prior to the meeting to ensure invitation is sent to you. n accordance with the Americans Disabilities Act (ADA), the information contained in this RFP is available in an alternative format by request. Please contact Myung Chun (Myung.chun@lbwater.org) if you have any questions regarding this project. The LBUD reserves the right to reject any or all proposals. The LBUD will select the Consultant, which appears most likely to provide the services under the conditions that would be in the best interest of the LBUD.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.