Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

November 20, 2023

May 3, 2024

7591 Cawnpore Ln

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

7591 Cawnpore Ln, Green Gables, PE

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Quotation for Snow Removal, salting and sanding of parking lots, parking areas, municipal mailbox on Cawnpore Lane, walkway into the Resort Municipality Office, walkway into the downstairs area, walkway into the Cavendish Information Centre main entrance, garbage cans by VIC entrance and beside the maintenance shed, oil delivery and oil pipe areas and electric charging station seven (7) days a week with no snow to be pushed up against the building by the snow clearing equipment. Bidders are required to quote on snow removal, salting and sanding of front and rear parking lots, parking areas, municipal mailbox on Cawnpore Lane, walkways into the municipality offices, walkway into the visitor information center main entrance, garbage cans by VIC entrance and beside the maintenance shed, oil delivery and oil pipe areas and electric charging station seven (7) days a week and no snow is to be pushed up against the building by the snow clearing equipment. Snow Removal, salting and sanding shall begin on November 20, 2023, and shall stay in effect until May 3, 2024. Snow Removal is to be completed Monday through Sunday, seven (7) days per week and shall be completed no later than 8:00 a.m. each morning and shall be cleared, salted and sanded throughout the day as required until 5:00 p.m. The third Monday of each month the parking lot will need to be kept clean until 8:00 p.m. due to meetings with the public. All equipment is to be covered by Public Liability and Property Damage Insurance, as set forth in the Bid Form. Proof of Insurance is to be supplied to the municipality. Quotations should be submitted on the attached Bid Form and shall include a complete description of what services are being provided. Any questions with respect to the quotation, please contact the CAO, Brenda MacDonald at 963-2698. The lowest or any quotation will not necessarily be accepted. We reserve the right to reject any quotation if, in our sole discretion, it is deemed advisable.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.