Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

January 8, 2024

January 30, 2024

To Be Determined

Paving, Site Work

No Information to Display

$1,212,000.00

Public - City

img_map_placeholder

To Be Determined, Mobile, AL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Upon selection, the CMAR will notify each bidder with the results of the selection. Major items of work include Bid Package #2A - Temporary Access Road and Bid Package #2B - Building Pads at the Mobile International Airport. The project shall be completed within 22 Calendar Days of the Issuance of Notice to Proceed for Bid Package #2A. Liquidated Damages for both projects shall be 6% annum of original contract per Calendar Day. A Minority Business Enterprise (MBE) goal of 14.63% has been established for this project. The Owner's award of this contract is conditioned upon Bidder or Offeror satisfying the good faith effort requirements of 49 CFR 26.53. As a condition of bid responsiveness, the Bidder or Offeror must submit the following information with their proposal on the forms provided herein: (1) The names and addresses of Minority Business Enterprise (MBE) firms that will participate in the contract. (2) A description of the work that each MBE firm will perform. (3) The dollar amount of the participation of each MBE firm listed under (1) (4) Written statement from Bidder or Offeror that attests their commitment to use the MBE firm(s) listed under item (1) to meet the Owner's project goal. (5) If Bidder or Offeror cannot meet the advertised project MBE goal; evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR Part 26. Per 49 CFR Part 26.53(b)(3), the Bidder may submit evidence of a good faith effort within five (5) days after the bid opening. (6) Written confirmation from each listed MBE firm that is participating in the contract in the kind and amount of work provided in the prime contractor's commitment. All prospective bidders MUST notify the CMAR of their intention to bid on the project a minimum of 72 hours before the time specified for receiving of bids. Bids must be submitted on the forms included within the contract documents and specifications. Bids shall include all pages included in Division I - Bid Documents. Submission of the entire contract book is not required. Guarantee of Bid IS NOT required. Contract bond will be required as follows: 100% of the contract price. Labor and Materials Bond will be required as follows: 100% of the contract price. No bids will be considered unless the bidder, whether resident or non-resident of Alabama, is properly qualified with the State of Alabama. In addition, non-residents of the State, if a corporation, shall show evidence of having qualified with the Secretary of State to do business in Alabama. No contract will be awarded unless the contractor holds a current and appropriate license from the State Licensing Board for General Contractors, Montgomery, Alabama. No bid shall be withdrawn for a period of 60 days subsequent to the opening of bids without the consent of the Owner. MAA reserves the right to reject any and all proposals submitted; to select one or more responding parties; to void this RFP and the review process and/or terminate negotiations at any time; to select separate responding parties for various components of the scope of services; and to select a final party/parties from among the proposals received in response to this RFP. Additionally, any and all RFP project elements, requirements and schedules are subject to change and modification. MAA also reserves the unqualified right to modify, suspend, or terminate at its sole discretion any and all aspects of this RFP process, to obtain further information from any and all responding parties, and to waive any defects as to form or content of the RFP or any responses by any party. This RFP does not commit MAA to award a contract, defray any costs incurred in the preparation of a response to this RFP, or contract for any services. All submitted responses to this RFP become the property of MAA as public records. All proposals may be subject to public review, on request, unless exempted as discussed elsewhere in this RFP. By accepting this RFP and/or submitting a proposal in response thereto, each responding party agrees for itself, its successors and assigns, to hold MAA and its agents, directors, consultants, attorneys, officers, and employees harmless from and against any and all claims and demands of whatever nature or type, which any such responding company, its representatives, agents, contractors, successors or assigns may have against any of them as a result of issuing this RFP, revising this RFP, conducting the selection process and making a final recommendation, selecting a responding party/parties or negotiating or executing an agreement incorporating the commitments of the selected responding party. By submitting responses, each responding party acknowledges having read this RFP in its entirety and agrees to all terms and conditions set out in this RFP. Prospective bidders must obtain the plans and specifications from the CMAR in order to submit a proposal.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.