Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2023

December 15, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

$75,000.00

Public - County

img_map_placeholder

To Be Determined, Omaha, NE

Our team is requesting plans for this project.

Subscribe to View Full Documents

Sealed proposals for the furnishing of all labor, tools, materials, equipment, and all else necessary to construct properly all of the improvements within the improvement generally designated Water Tower Maintenance , Sanitary and Improvement District No. 79 of Sarpy County, Nebraska MEADOW OAKS. In the presence of all bidders, and consider the bids received for the furnishing of such labor, materials, and equipment necessary for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listed below and other related preparatory and subsidiary work from issuance of the Notice to Proceed: ITEM NO. DESCRIPTION APPROXIMATE QUANTITY UNIT PRICE AMOUNT 1 ABRASIVELY BLAST AND CLEAN WATER TOWER AND PAINT WATER TOWER (ONE COAT EPOXY PRIMER, ONE COAT EPOXY ONE FINISH COAT) - INTERIOR 1 LS $60,000.00 $60,000.00 TOTAL ESTIMATED CONSTRUCTION COSTS $60,000.00 ESTIMATED ENGINEERING, LEGAL, PUBLICATION AND MISCELLANEOUS COSTS $15,000.00 TOTAL ESTIMATED PROJECT COST $75,000.00 Upon approval, the Owner will issue payment to the Contractor in the amount of 90% of the contracted value of the completed work as of the end of the preceding month, as recommended by the Engineer. Payment for the balance retained will be issued by the Owner upon completion of the work and approval thereof by the Owner's Engineer, City or Governmental approval when necessary, and acceptance by the Owner. Contractor must give 24-hour notice to Engineer when picking up paper sets. Each bid shall be accompanied, in a separate sealed envelope, by a certified or bank check drawn on a bank whose deposits are insured by the F.D.I.C. or an acceptable bid bond in the amount of $3,000.00 and shall be payable without condition to SANITARY AND IMPROVEMENT DISTRICT NO. 79 OF SARPY COUNTY, NEBRASKA as a guarantee that the bidder, if successful, will execute the contract and provide an acceptable Contract Bond from an approved surety in the amount of 100 percent of the contract price. No bidder may withdraw his Bid for a period of THIRTY (30) days after the date set for the opening of bids. The Owner reserves the right to reject any or all bids and to waive informalities

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.