Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

April 1, 2024

June 26, 2024

Lincoln Hwy

Site Work

No Information to Display

$835,125.00

Public - City

img_map_placeholder

Lincoln Hwy, Clinton, IA

Our team is requesting plans for this project.

Subscribe to View Full Documents

This project involves the construction of a sanitary sewer extension project into the Lincoln Way Railpark from 44th Avenue South to the north. The project includes the construction of a total of four thousand seven hundred eleven linear feet (4,711 LF) of eighteen inch (18") diameter sanitary sewer. The pipeline shall be connected to an existing manhole along the collection system at 44th Avenue South. The pipeline sanitary sewer construction project also consists of the installation of eleven (11) sanitary sewer structures throughout, Engineer's opinion of probable cost: $835,125.00 Late start date: April 1, 2024. Days worked prior to April 1, 2024, will not count as working days Final completion date: Sixty (60) working days from late start date, and this includes completion of all bid items on this project, including seeding. Question Deadline 11/09/2023 at 12:00 PM CT

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.