Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

April 2, 2024

July 1, 2024

King St

Demolition, New Construction, Paving, Site Work

No Information to Display

$1,500,000.00

Public - State/Provincial

img_map_placeholder

King St, Georgetown, DE

Subscribe to View Full Documents

Pre-bid Meeting: No Location: Sussex County These Improvements Are More Specifically Shown on the Location Map(S) of the Attached Plans. The improvements consist of furnishing all labor and materials for the replacement of BR 3-320 which will involve replacement of the existing corrugated metal pipe arches and concrete headwalls with a precast box culvert, and reconstruction of the approach roadway. The proposed structure will be extended outside the clear zone and pedestrian railing will be added to the new headwalls to replace the existing concrete barrier. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Completion Time: All Work on This Contract Must Be Complete Within 90 Calendar Days. Extensions of Contract Time Due to Weather Are Specified in the Standard Specifications Section 108.7f, Weather Days. It is Estimated a Notice to Proceed is Issued Such That Work Starts on or About April 2, 2024. Questions Regarding This Project Are to Be E-mailed to the Above Address No Less Than Six Business Days Prior to the Bid Opening Date in Order to Receive a Posted Response. Please Include the Contract Number in the Subject Line. Surety Bond - Each Proposal Must Be Accompanied by a Deposit of Either Surety Bond or Security for a Sum Equal to at Least 10% of the Amount Bid. Performance-based Rating System - 29 Del.c. 6962 (C)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. Refer to general Notices for Details. DEDOT - Replacement of BR 3-320 on King Street

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.