Power Rd
Paving, Site Work
No Information to Display
$55,000,000.00
Public - City
Power Rd, Mesa, AZ
The proposed improvements are as follows: In 2023 the City of Mesa, with partner agencies Maricopa County Department of Transportation (MCDOT) and the Town of Gilbert, completed a design concept report (DCR) that identified the improvement needs for the corridor from the north side of the SR 202 (approximately 1/2 mile south of Warner Road) to the south side of the East Maricopa Floodway (EMF). The development of this roadway will add roadway capacity and connectivity in this rapidly developing area. The project is currently funded with local funds. However, federal funding may be utilized for construction based on funding availability and timing of the project. The plan for funding will be finalized through the IGA process. If federal funding is incorporated into the project all appropriate federal requirements will apply including but not limited to environmental, right of way, and utility requirements and clearances. The proposed roadway improvements include the following: o A fully improved 6-lane section with bike lanes, a raised landscaped median with irrigation, and dual left turns at arterial intersections. o New full-depth asphalt pavement o Storm drain, curb and gutter, sidewalks, and commercial driveways o Streetlight improvements o Traffic signals at Nunneley Road, Warner Road, Elliot Road and traffic improvements as needed. o Intersection improvements with ADA-compliant sidewalk ramps and pedestrian equipment o Signing and pavement marking o The incorporation of any recently completed half-street improvements by adjacent developments. o Water, gas, and sewer improvements as required. o Private utility coordination o Right of way acquisition support o And other miscellaneous improvements, as needed. o Federal requirements application and support (if federal funding is utilized). The estimated construction budget for the project is $55,000,000. Construction is anticipated using the CMAR delivery method. However, if federal funding is applied to the project, the construction will be low bid
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Mesa, AZ
--
Mesa, AZ
Bid Date: Oct 19 2023
Mesa, AZ
Bid Date: Feb 08 2023
Mesa, AZ
Bid Date: Nov 03 2023
Mesa, AZ
--
Mesa, AZ
Bid Date: Jul 11 2023
Mesa, AZ
Bid Date: Nov 21 2023
Mesa, AZ
Bid Date: Oct 25 2023
Mesa, AZ
Bid Date: Oct 17 2023
Mesa, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.