Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 18, 2024

No Information to Display

Power Rd

Paving, Site Work

No Information to Display

$55,000,000.00

Public - City

img_map_placeholder

Power Rd, Mesa, AZ

Subscribe to View Full Documents

The proposed improvements are as follows: In 2023 the City of Mesa, with partner agencies Maricopa County Department of Transportation (MCDOT) and the Town of Gilbert, completed a design concept report (DCR) that identified the improvement needs for the corridor from the north side of the SR 202 (approximately 1/2 mile south of Warner Road) to the south side of the East Maricopa Floodway (EMF). The development of this roadway will add roadway capacity and connectivity in this rapidly developing area. The project is currently funded with local funds. However, federal funding may be utilized for construction based on funding availability and timing of the project. The plan for funding will be finalized through the IGA process. If federal funding is incorporated into the project all appropriate federal requirements will apply including but not limited to environmental, right of way, and utility requirements and clearances. The proposed roadway improvements include the following: o A fully improved 6-lane section with bike lanes, a raised landscaped median with irrigation, and dual left turns at arterial intersections. o New full-depth asphalt pavement o Storm drain, curb and gutter, sidewalks, and commercial driveways o Streetlight improvements o Traffic signals at Nunneley Road, Warner Road, Elliot Road and traffic improvements as needed. o Intersection improvements with ADA-compliant sidewalk ramps and pedestrian equipment o Signing and pavement marking o The incorporation of any recently completed half-street improvements by adjacent developments. o Water, gas, and sewer improvements as required. o Private utility coordination o Right of way acquisition support o And other miscellaneous improvements, as needed. o Federal requirements application and support (if federal funding is utilized). The estimated construction budget for the project is $55,000,000. Construction is anticipated using the CMAR delivery method. However, if federal funding is applied to the project, the construction will be low bid

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.