Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 21, 2023

December 21, 2023

September 27, 2024

2025 200th Ave

Paving, Site Work

No Information to Display

$795,000.00

Public - County

img_map_placeholder

2025 200th Ave, Lynd, MN

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Lyon County Landfill Phase 9B-1 Construction Site Directions: Lyon County Sanitary Landfill, 2025 200th Ave, Lynd, MN 56157 The Contract provides for the construction of a new landfill cell, Phase 9B-1, over an old unlined landfill area. Construction of Phase 9B-1 includes stripping and stockpiling topsoil from the old unlined landfill cover, completing earthwork necessary to establish the Phase 9B-1 subgrade, installing a compacted low permeability material (clay) liner, geosynthetic clay liner, geomembrane liner, leachate collection piping system, granular drainage layer (sand), and related items. The Contract also includes the installation of new leachate recirculation manifold manholes, piping connections to the existing gas collection and control system, decommissioning of an existing leachate loadout pad, and dredging an existing sedimentation basin. The Contract also includes three alternative bid items, including a "waste push" upon completion of construction of Phase 9B-1 and certification of the cell by the MPCA to move waste from the existing Phase 9A and/or Phase 10A into the new Phase 9B-1 to establish 6-feet of waste placement in the new cell, fencing replacement and repairs, and installation of a new culvert at an existing sedimentation basin. The Contractor shall include furnish all supervision, labor, tools, equipment, transportation, storage facilities, services, and supplies required to complete the Work as indicated in the Contract Documents. The Work shall be Substantially Completed on or before August 30, 2024 and completed and ready for final payment in accordance with the GENERAL CONDITIONS on or before September 27, 2024.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.