Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
No Information to Display
May 22, 2024
No Information to Display
Multiple Locations
Service, Maintenance and Supply
No Information to Display
No Information to Display
Public - County
Multiple Locations, Conroe, TX
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The deadline for written questions is Monday, November 13, 2023 at @ 11:00 A.M. CST. This deadline has been established in order to provide adequate time for SJRA staff to prepare responses to questions from Respondents to the best of their ability in advance of the due date and time. The scope of work for this project will be further developed and detailed following the Consultant selection. However, the following provides a summary of what this project would most likely entail and would most likely be performed in multiple phases. 1. Planning - The Consultant will produce a plan for collection of field data which will be utilized for sampling/testing, which could include either or both non-destructive and destructive testing. The Consultant will first become familiar with the SJRA Woodlands Division water system via analysis of existing maps, record drawings, product submittals, GIS, operational data, maintenance records, WaterGEMS water model, survey information, geotechnical information, fault information, LiDAR information, environmental information, previous studies, water sample data, and any other data/documents/etc. that is available from the SJRA, Woodlands Water Agency, Texas Commission on Environmental Quality, Texas Water Development Board, The Woodlands Development Company, USGS and/or any other entity or stakeholder that could provide data on the water system. The Consultant will also become familiar and utilize for planning the SJRA Woodlands Division Asset Management Plan and Water Line Design Criteria Manual. This plan may include, but not be limited to map(s) and list(s) of locations for sampling/testing, schedule for testing, impacted stakeholders, potential traffic impacts, and budget that identifies individual sampling/testing location costs and annual costs. For proposed testing, the Consultant will perform a testing technology review to determine which technologies are best suited to meet the needs of SJRA in this endeavor. The planning portion of the project may also include identification of stakeholders and the development of a public engagement approach. 2. Non-Destructive Sampling/Testing - Based upon the sampling/testing plan, the Consultant will identify locations to perform non-destructive sampling/testing which does not require removal of a portion of the pipe for laboratory testing. Such testing of the pipe may include visual testing, scale or abrasive analysis, vibration/sonar testing, ultrasonic testing, x-ray testing, internal borescope inspections, Subsurface Utility Engineering (SUE), or any other testing that may or may not require attachment to or entry into the pipe via an existing outlet. In addition to tests of the water line, non-destructive testing may also include, but not be limited to soil sampling, testing, and analysis by a Geotechnical Engineer, water chemistry analysis, and vibration analysis resulting from roadway traffic or other sources. 3. Destructive Sampling/Testing - Based upon the sampling/testing plan, the Consultant will identify locations to perform destructive sampling which could require removal of a piece, section or entire joint of pipe. Such sampling would allow for testing such as, but not limited to, compressive strength, flexural strength, hardness, and chemical analysis. SJRA will provide the contractor who will excavate the pipe, remove a section of AC pipe and replace it with new pipe. The Consultant will provide the testing laboratory who will receive the section of AC pipe and perform testing. 4. Water Line Renewal Recommendations - Following all planning, sampling and testing performed as noted in Items 1-3 above, the Consultant will prepare a report providing estimates of remaining useful life for the AC water lines, with granularity of water line segments to be determined in the planning phase, and from this, a schedule and scope of water lines to be renewed including cost estimates. A predictive modeling software may be utilized to analyze and evaluate the collected data. SJRA's insurance requirements are provided in the Professional Services Agreement attached hereto as Exhibit A to this RFQ. The method of Contractor Selection has not been Determined at this time.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Conroe, TX
Bid Date: May 18 2023
Conroe, TX
Bid Date: Oct 31 2023
Conroe, TX
--
Conroe, TX
--
Conroe, TX
Bid Date: Nov 09 2023
Conroe, TX
Bid Date: Nov 07 2023
Conroe, TX
--
Conroe, TX
Bid Date: Oct 18 2023
Conroe, TX
--
Conroe, TX
Bid Date: Sep 22 2023
Conroe, TX
Bid Date: Oct 30 2023
Conroe, TX
Bid Date: Sep 21 2023
Conroe, TX
Bid Date: Dec 05 2023
Conroe, TX
Bid Date: Dec 05 2023
Conroe, TX
Bid Date: Nov 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
