Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 1, 2023

No Information to Display

Formosa Rd

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Formosa Rd, Troy, IL

Our team is requesting plans for this project.

Subscribe to View Full Documents

City/County Troy Schedule of Prices 20200100 EARTH EXCAVATION CU YD 200 20400800 FURNISHED EXCAVATION CU YD 100 25000110 SEEDING, CLASS 1A ACRE 1.3 25000400 NITROGEN FERT NUTR POUND 117 25000500 PHOSPHORUS FERT NUTR POUND 117 25000600 POTASSIUM FERT NUTR POUND 117 25100105 MULCH, METHOD 1 ACRE 1.3 25100630 EROSION CONTR BLANKET SQ YD 430 28000250 TEMP EROS CONTR SEED POUND 130 28000305 TEMP DITCH CHECKS FOOT 12 28000500 INLET & PIPE PROTECT EACH 1 40600985 PCC SURF REM BUTT JT SQ YD 426 40604052 HMA SC IL-9.5 C N70 TON 865 40700100 BIT MATLS TACK CT POUND 2623 40800050 INCIDENTAL HMA SURF TON 113 44200948 CL B PATCH T1 9 SQ YD 7 44200956 CL B PATCH T2 9 SQ YD 618 44200962 CL B PATCH T3 9 SQ YD 56 44200964 CL B PATCH T4 9 SQ YD 416 45100200 CRACK FILLING POUND 5407 48100300 AGGREGATE SHLDS A 4 SQ YD 2312 542A0217 P CUL CL A 1 12 FOOT 32 54213657 PRC FLAR END SEC 12 EACH 2 67100100 MOBILIZATION L SUM 1 78001100 PT PVT MK LTRS & SYMB SQ FT 55 78001110 PAINT PVT MK LINE 4 FOOT 17815 78001150 PAINT PVT MK LINE 12 FOOT 235 78001180 PAINT PVT MK LINE 24 FOOT 32 X1500004 BIT SURF TREATMNT A1 SQ YD 5828 X4060987 PCC SUR RM BUTT JT SP SQ YD 681 X7010216 TRAF CONT & PROT SPL L SUM 1 Z0013798 CONSTRUCTION LAYOUT L SUM 1 CRACK FILL W/ BACKER ROD FOOT 2978 Project Location: Formosa Road - from Edwardsville Rd to Midwest Mulch and Compost entrance (1.006mi) Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Bituminous Materials - 22-00037-00-RS

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects