Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

November 30, 2023

May 28, 2024

221 Quarterline Rd

Renovation

No Information to Display

$130,000.00

Public - County

img_map_placeholder

221 Quarterline Rd, Muskegon, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Muskegon Community College Office of Financial Services seeks proposals from from qualified Contractors for the delivery and installation of furniture pursuant to the specification found in this RFP for Main Campus rooms 2012 and 2016, located on the 2nd floor. Proposals shall be sealed and plainly labeled on the outside of the envelope/box with "Muskegon Community College - Main Campus 2012 and 2016 Furniture Replacement Project" along with the name of the vendor/organization/firm submitting the proposal. It is the sole responsibility of the bidder to assure that their proposal is received by Muskegon Community College prior to the date and time specified. One (1) original and (5) identical copies should be submitted. Muskegon Community College is a smoke-free, tobacco and weapons free campus. The Contractor will work pursuant to the specifications attached in the RFP, project specifications and drawings for the project. All planned installation - delivery, demolition, installation services and startup will be performed during normal campus working hours that match applicable requirements of Muskegon Community College. Monday - Friday 7am - 5pm. There will be no holiday or weekend access unless specifically approved by the MCC Office of Physical Plant. For hours not listed or described herein, the contractor will provide a request for access to the Office of Physical Plant to review, plan and approve hours outside of the regular business day. Delivery, demolition, removal, assembly, and installation shall be performed by the contracted party. Safety of the Contractor, sub-contractors, campus community, and guests is paramount in all projects. The Contractor will provide signage, fencing, barricades, cones, and other to the satisfactory of the College to provide separation from the work site and associated areas to promote a safe project site. This project is not subject to Michigan prevailing wage requirements. To ensure there is no conflict with the delivery of items the contractor shall coordinate the delivery date, delivery location, and installation schedule of items with the College's contract administrator prior to first delivery date. All transportation, delivery, installation, and disposal arrangements shall be the responsibility of the Contractor. The Contractor shall have complete responsibility for supplies, items, and equipment until they are delivered, unpacked, and installed at all sites defined therein. The College does not have long-term storage facilities (shipping and receiving) and shall not accept items prior to delivery unless expressly noted during the RFP submission and authorized by the College. Dumpster space is available within 500 ft. in the northwest parking lot, adjacent to the work area. Contractor will be responsible for all construction separation fencing, temporary signage, cones, barricades, and applicable measures to ensure a safe jobsite for the duration of the project until completion. The Contractor shall be responsible for the daily removal of crating and packing materials from the College premises. The Contractor shall be solely responsible for correcting damages to the college premises resulting from the installation process. The Contractor will comply will all Federal, State, and local laws, and regulations governing the furnishing and use of all safeguards, safety devices, and protective equipment. The Contractor will take any other actions as necessary to protect the life and health of employees on the job and the safety of the public as well as protect property during the performance of the agreement.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.