Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

March 16, 2024

3301 Ruston Way

Site Work

No Information to Display

$75,000.00

Public - City

img_map_placeholder

3301 Ruston Way, Tacoma, WA

Subscribe to View Full Documents

Remove eight (8) 30-inch diameter steel piles from water at 3301 Ruston Way, contractor responsible to dispose/surplus piles. Estimate: $75,000 Requests for information regarding the specifications may be obtained by contacting Brandon Snow, Senior Buyer by email to bsnow@cityoftacoma.org. The Work includes, but not limited to, the following tasks at the City of Tacoma's Maritime Operations Security Center (Facility) as described below: 1. Removal and disposal of eight (8) existing 30-inch diameter steel piles 2. Performing any other work not covered in the Contract Drawings and Specifications in accordance with applicable references standards.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.