Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

January 17, 2024

No Information to Display

To Be Determined

Renovation

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

To Be Determined, Salisbury, PA

Our team is requesting plans for this project.

Subscribe to View Full Documents

GENERAL / MECHANICAL - CONTRACT 1/2024 ELECTRICAL - CONTRACT 2/2024 Contract Documents, including Drawings and Detailed Specifications, are on file at the following locations: Gibson-Thomas Engineering: 1004 Ligonier St., Latrobe, PA 15650; Phone: (724) 539-8562; Borough of Salisbury: 171 Smith Avenue, Salisbury, PA 15558; Phone: (814) 662-2605 Attention is called to the fact that the Borough of Salisbury Office hours are sporadic; therefore, it is not recommended that Bids are sent by Federal Express. A certified check, payable to the Borough of Salisbury, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to 10 percent (10%) of the total of the Bid shall be submitted with each bid to guarantee the Bidder's entrance into a contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements set forth in the plans, specifications, or any applicable statutes of the Commonwealth of Pennsylvania, or any applicable municipal ordinances. All contractors must adhere to Act 127 of 2012 (Public Works Employment Verification Act), Nondiscrimination/Sexual Harassment Provisions, State Contractor Responsibility Program, the Americans with Disability Act, Anti-Pollution Regulations, Contractor Integrity Provisions, Prohibition of Illegal Alien Labor on Assisted Project Act and the Right-of-Know Law and the American Iron & Steel Act. Pennsylvania Prevailing wages will apply to this contract. The Borough of Salisbury reserves the right to reject any or all bids or to waive any informalities in the bidding. Award criteria and basis for rejection will be in accordance with the Instructions to Bidders included in the /Bid Package. No bid may be withdrawn for one hundred twenty (120) calendar days after the scheduled closing time for receipt of bids.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects