Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

December 3, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

$350,000.00

Public - County

img_map_placeholder

Multiple Locations, Seattle, WA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The Contractor shall perform all the Work required by the Contract and the Project Manual including specifications, drawings or other technical data provided. The project entitled "Electrical Unit Price at Logistics Area - 2023" includes providing all labor, materials, equipment, tools, and incidentals to perform, complete and finish electrical systems installations. Electrical work includes but is not limited to installations of raceways, wiring, medium voltage cabling, boxes, transformers, miscellaneous electrical devices, temporary power and lighting assemblies, and equipment, testing, and grounding in accordance with all requirements of the code-enforcing agencies. Prevailing wages for all work performed pursuant to each work authorization must be the prevailing wage rates in effect at the beginning date for each contract year. Intents and affidavits for prevailing wages paid shall be submitted annually for all work completed within the previous twelve-month period of the unit priced contract. The contract will last one (1) year, 365 calendar days, from the official contract award date, which is the date the Port of Seattle signs the Agreement, or until the contract amount is depleted, whichever comes first. This contract contains an option to extend the contract time up to 12 months beyond the original contract completion date. Performance and Payment bonds will be required with the Contract. Each bond shall be in the full amount of the contract sum. No bid bond is required. Question Cut-off Date: Oct 26, 2023, 3:00:00 PM To submit questions regarding Bidding Documents, log into Vendor Connect.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects