Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Shoreview, MN

Our team is requesting plans for this project.

Subscribe to View Full Documents

Said bids to be for the furnishing of all labor and materials for the construction, complete and in place in accordance with the plans and specifications for the following estimated quantities of work: 1 LS Mobilization 1 LS Clearing and Grubbing (Shrubs, Bushes) 20 EACH Clearing (Tree Removal) 19 EACH Grubbing (Stump Removal) 28 LF Remove Wood Fence (2-Rail Type) 18 CY Salvage (Shoreline Fieldstone) Riprap 1 LS Dewatering (Pumping to Lower Pond Water Levels) 3 EACH Construct Entrance (Temporary Pond Access Route) 3,880 CY Excavation - Channel/Pond (Sediment/Muck - No Restrictions) 4 HOUR Street Sweeper with Pickup Broom 1 LS Temporary Water Retention Barrier 18 CY Reinstall Salvaged (Shoreline Fieldstone) Riprap with Geotextile Fabric 28 LF Wood Fence (2-Rail Type) 1 LS Traffic Control 7 EACH Storm Drain Inlet Protection 500 LF Sediment Control Log Type Straw 160 CY Common Topsoil Borrow 1,930 SY Sodding Type Lawn 660 SY Erosion Control Blanket Cat. 3N Wood 0.16 ACRE Seeding 0.16 ACRE Seed Mix 32-242A (15 lbs/acre) with Fertilizer The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the advertisement for bids of the City of Shoreview shall comply with the provisions of the statute. Bidding documents are on file with the city manager and may be seen at the city hall, public works department. Bids will be not considered unless accompanied by a bid bond payable to the City of Shoreview, for five percent (5%) of the amount bid to be forfeited as liquidated damages in the event the bid is accepted and the bidder fails to enter promptly into a written contract and furnish the required bond. All bidders for contract amounts of $100,000 or more shall require contractors, sub-contractors, and vendors which have 40 or more full-time employees to submit a copy of their affirmative action certification for the current period after their bid, before construction. The owner reserves the right to reject any and all bids, to waive irregularities and informalities therein and to accept the bid deemed in their best interest. It is expected that the City of Shoreview will consider the bids at their council meeting on November 20, 2023.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects