Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 27, 2023
November 27, 2023
No Information to Display
Multiple Locations
Demolition, Paving, Site Work
No Information to Display
$70,000.00
Public - City
Multiple Locations, Fort Scott, KS
Plans and Specifications are not available for this project. If that changes, they will be made available here.
A two-story building located at 4 South National Avenue including the basement and substructure. The existing basement floor can remain intact; however, the walls and remaining structure is to be removed. A two-story building located at 10 South National Avenue including the footings and foundation and any substructures. The contractor's insurance requirements are Contractor's Liability Insurance with limits of $100,000 and $500,000 to protect the Contractor and his sub-contractors against claims due to accidents which may occur or result from operations under the contract. Property Insurance shall cover the use of all equipment, hoist, and motor vehicles, on the site, or hauling materials or debris from the site and Demolition Insurance. All building materials are to be removed, including footings, substructures, sidewalks, and asphalt parking areas. All pavement, concrete, and asphalt on the entire site: approximately 24,044 sq ft. Demolition of existing pavement should include removal of corresponding asphalt parking lot areas and sidewalks. All broken asphalt and other debris from demolition structures and of the pavement should be removed from the site. Areas disturbed during demolition should be thoroughly evaluated by the licensed geotechnical engineer prior to placement of structural fill. All disturbed soils should be undercut prior to placement of structural fill. All structural fill should consist of approved materials, free of organic matter and debris. Imported fill and structural fill within 12 inches of building slabs and 8 inches of pavement, should consist of cohesive low volume change (LVC) soils, having a liquid limit less than 45 percent and a plasticity index between 10 and 25 percent. The majority of the on-site soils meet these requirements. Fill should be placed in lifts having a maximum loose lift thickness of 8 inches. Pad site should be graded 6" below the finished floor elevation of new building to be located on lots 6 & 8. Confirm Finished Floor Elevations by contacting Janet Trump at Kaw Valley Engineering (785-762-5040). Topographic Survey may be requested from Janet Trump at Kaw Valley Engineering. All utilities must be properly disconnected prior to demolition per City requirements. Work should be completed within 20 days from acceptance of bid. Liquidated damages shall be calculated as a fixed sum per day of delay. This sum is agreed upon by both parties and is hereby set at $1,148 per day for each day of delay beyond the agreed-upon completion date. The Contractor shall be liable for the payment of liquidated damages within 30 days after receiving a written notice from the City specifying the total amount of liquidated damages due.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Fort Scott, KS
Bid Date: Oct 16 2024
Fort Scott, KS
Bid Date: Sep 23 2024
Fort Scott, KS
Bid Date: Aug 21 2024
Fort Scott, KS
Bid Date: Oct 06 2023
Fort Scott, KS
Bid Date: Oct 12 2023
Fort Scott, KS
Bid Date: Aug 21 2023
Fort Scott, KS
Bid Date: Sep 14 2023
Wichita, KS
Bid Date: Oct 27 2023
Wichita, KS
Bid Date: Oct 27 2023
Lawrence, KS
Bid Date: Nov 07 2023
Lawrence, KS
Bid Date: Nov 07 2023
Lansing, KS
Bid Date: Nov 06 2023
Mission, KS
Bid Date: Nov 09 2023
Salina, KS
Bid Date: Nov 09 2023
Wichita, KS
Bid Date: Nov 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
