Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 1, 2023

No Information to Display

To Be Determined

Renovation

No Information to Display

$33,500,000.00

Public - County

img_map_placeholder

To Be Determined, Port Chester, NY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project will upgrade the primary settling tanks, secondary clarifiers, sludge thickeners, sludge storage facilities and plant effluent pumps, including upgrades to all mechanical, plumbing, HVAC, odor control, instrumentation, electrical, controls, structural, and architectural systems, and all necessary appurtenances at the Port Chester WRRF. Work will also include the replacement of the grease handling system, replacement of the mechanical collection equipment and any structural supports for the mechanical equipment, structural repairs to the tank floors, walls, decks, and grating, replacement of odor control equipment, replacement or installation of new sludge thickening and dewatering equipment, replacement of pumps, including the primary sludge pumps, the primary scum pumps, and the secondary sludge pumps, piping, and valves, installation of a new sludge recirculating system, installation of a new polymer feed system, installation of a new plant wide flushing water system, and installation of a new plant wide flood detection system. The work will also include the evaluation of flood mitigation measures for the Rotating Biological Contactors; and a plant wide SCADA upgrade. As of October 26, 2023, this project is included in the Westchester County's FY 2024-2028 CIP. An engineer has been selected for the project. Information regarding the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects