Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

No Information to Display

S Morehall Rd

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

S Morehall Rd, Charlestown Township, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Automated Traffic Signal Performance Measures (ATSPM) Along Morehall Road (SR 0029). Question Deadline 10/31/2023 at 5:00 PM ET. Upon request, bidder will prove that he has liquid assets, available for the project upon which he is bidding in an amount equal to fifteen per centum (15%) of the first $100,000.00 of the amount of the bid plus ten per centum (10%) of the next $900,000.00 plus five per centum (5%) of the remainder of the bid. All proposals (bids) are to be accompanied by a bid bond or certified check in the amount of 10% of the total bid. The Township reserves the right to waive any minor informalities, irregularities or defects in the bid; or to reject any or all of the bids. Notice is hereby given that the Board of Supervisors of East Whiteland Township, Chester County, PA will accept sealed proposals for the following. Liquidated Damages If the Contractor refuses or fails to prosecute the work with such diligence as will ensure its completion within the time specified in these Contract Documents, or as modified as provided in these Contract Documents, the Owner, by written notice to the Contractor, may terminate the Contractor's right to proceed with the work. Upon such termination, the Owner may take over the work and prosecute the same to completion by contract or otherwise, and the Contractor and his sureties will be liable to the Owner for additional cost incurred by the Owner for liquidated damages for any delay in the completion of the work as provided below If the work is not completed within one hundred twenty (120) calendar days, including any extensions of time for excusable delays as herein provided, the Contractor will pay to the Owner Liquidated Damages for each calendar day of delay, hereafter set at $975.00 per calendar day, and the Contractor and his sureties will be liable to the Owner for the amount thereof. Scope The following paragraphs outline minimum acceptable standards to be followed for the installation and construction of traffic signal equipment and all appurtenances as indicated in these specifications. The work shall be executed in the most workmanlike manner by qualified, careful and experienced workmen. The Owner reserves the right to reject any or all bids, or parts thereof, as it may deem best for the interest of the Owner.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects