Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 15, 2025

November 15, 2026

To Be Determined

Renovation

No Information to Display

$5,000,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Radisson, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Construction work for redevelopment of the cafeteria and dining room to accommodate 350 people per meal, peak period, during work on major projects . TIMELINE: The owner is currently Requesting proposals from architectural and engineering professional consulting firms to complete preliminary studies, conceptual design, preliminary plans and working drawings preparation and construction work monitoring. Reference number: 1773199. Deadline for receipt of complaints: 2023-11-09. Proposals submitted electronically are not accepted.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects