Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 17, 2023

December 18, 2023

April 16, 2024

To Be Determined

Renovation

No Information to Display

$700,000.00

Public - County

img_map_placeholder

To Be Determined, Santa Fe, NM

Subscribe to View Full Documents

All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing to Casey W. Cook, P.E. at ccook@molzencorbin.com or fax to (505) 242-0673 for interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. A. Project titled "Tank No. 3 Rehabilitation" entails: 1. Rehabilitating existing 500,000-gallon welded steel water tank, replace roof vent, replace target, and install new 30'' manway and cathodic protection system. 2. Disinfection of water tank upon completion of the Work and after the 11-month inspection. This shall be considered incidental to construction and no separate payment will be made. 1.02 CONTRACT A. The Work shall be performed under unit prices Bid items and reimbursable allowances. 1.03 SUMMARY BY REFERENCES A. Work of the Contract can be summarized by references to the Contract, General Conditions, Supplementary Conditions, Specification Sections, Drawings, Addenda and Modifications to the Contract Documents issued subsequent to the initial printing of this Project Manual and including, but not necessarily limited to, printed material referenced by any of these. It is recognized that work of the Contract is also unavoidably affected or influenced by governing regulations, natural phenomena, including weather conditions, and other forces outside the Contract Documents. 1.04 CONTRACTOR USE OF THE PREMISES A. The immediate premises of work will be at the disposal of the Contractor during the construction period.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects