Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

September 30, 2024

No Information to Display

19 Flagg Dr

Renovation

No Information to Display

$610,000.00

Public - City

img_map_placeholder

19 Flagg Dr, Framingham, MA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project is included in the City of Framingham 2024-2028 Capital Improvement Program (CIP). As of October 24, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however, funding is being allotted to fiscal year 2024. A detailed scope has not yet been released. This request for capital budget funding is for the purchase and installation of an appropriately sized generator at the Farley Building. The current generator is greatly undersized for the Districts needs now that the building is occupied by central office staff. This project would allow for the installation of an appropriately sized generator that will provide coverage for the newly relocated offices. Additionally, this generator will be designed to support future operational expansion within the building, allowing for continued operations of the District`s Central Office during power outages. The requested funding amount incorporates an increase due to continued inflation and fluctuation in pricing experienced in the market. While this is an estimate, we believe the number will cover all costs associated with this project but understand the continued market fluctuation will result in volatile numbers for the foreseeable future. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.